Temenuzhka Petkova: Equipment for Belene NPP will be delivered by end 2017

Photo: BGNES

The whole equipment of the two nuclear reactors for the suspended Belene NPP will be delivered to Belene by the end of 2017, Bulgaria’s Minister of Energy Temenuzhka Petkova said on Wednesday. On Tuesday Minister Petkova met with representatives of Russia’s company Rosatom which manufactures the equipment. Bulgaria and Rosatom are holding talks aimed at signing an agreement for preservation of the nuclear equipment, Minister Petkova pointed out and added that according to the report of the Bulgarian Academy of Sciences about the necessity of construction of Belene nuclear power plant, Bulgaria and the region will need new nuclear facilities in 2035.

More from category

Transport generates 63% of harmful emissions making multimodal transport important: Commissioner Violeta Bulc

Transport generates 63% of the harmful emissions of carbon dioxide in a global perspective which makes the introduction of multimodal transport important .  This is the stance voiced by the European Commissioner for Mobility and Transport Violeta Bulc..

published on 3/20/18 6:01 PM

Israel keen to invest in Bulgaria high technology sector: Rumen Radev, update

Bulgaria is ready for cooperation with Israel in economy, investments and science, Bulgarian President Rumen Radev has said while meeting in Jerusalem with Israeli counterpart Reuven Rivlin. The Israeli president has said that Jews will never..

updated on 3/20/18 5:43 PM

Precautions taken in wake of reports of Danube River waters rising

Fire Safety and Protection of the Population Directorate General at the Bulgarian Interior Ministry has taken precautions prompted by reports about rising levels of the Danube River waters. According to information from the Executive Agency for..

published on 3/20/18 5:41 PM