Corinth Pipeworks, a part of Cenergy Holdings, has won the 58.2m-euro tender for delivery of pipes for construction of the gas interconnector between Bulgaria and Greece.
The Greek pipe maker was one of the three pre-selected candidates, one of which withdrew from the procedure, while the other did not meet the technical requirements. Bulgaria plans to start using the 182-kilometer gas pipeline from 2020 onwards to import Azerbaijani gas and thus end its almost full dependence on Russian natural gas.
On Friday, the weather in Bulgaria will be mostly sunny. There will be weak wind in the eastern parts, stronger winds in the western half of the country. Daytime temperatures will be on the rise - highs will reach 21°C to 26°C, in Sofia – around..
The European Public Prosecutor's Office in Sofia has conducted searches at two hotels in a Bulgarian ski resort as part of an investigation into fraud involving EU subsidies for Covid-19, reports BNR's Brussels correspondent Angelina Piskova. The money..
Bulgaria's President Rumen Radev has started consultations with the candidates for caretaker prime minister. President Radev hands ITN the third cabinet-forming mandate, they hand it back to him unfulfilled Under the constitutional changes from..
The three regions in the European Union with the highest standardised death rate in 2021 were all in Bulgaria, EU statistics agency Eurostat said. In..
The government has designated three Bulgarian carriers to operate international flights between Bulgaria and China. Compass Cargo Airlines will..
The NSI data on inflation in the country are not and cannot be manipulated, as the National Statistical Institute is is subject to monthly inspection by..
+359 2 9336 661