Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Operational readiness of Unit 5 of Kozloduy NPP tested for upgraded power performance

Photo: BGNES

After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.

The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Separate collection of waste in Bulgaria is not up to par yet

In connection with the forthcoming adoption of the regulation on  packaging and packaging waste, the branch Association Polymers is organizing a discussion on the role of recycling. The quality collection and recycling of waste is the principal way..

published on 3/28/24 10:38 AM
Sofia University St. Kliment Ohridski

Sofia University searched over bomb threat

A bomb threat was made this morning against St. Kliment Ohridski University in Sofia. According to Interior Ministry information, the threat was emailed to the university. Police have arrived on site and are searching the building. Nothing has so..

published on 3/28/24 9:34 AM

More than 900 children are looking for adoptive parents, families looking to adopt a child double that number

At the beginning of the year, there are more than 1,600 families who want to adopt a child, while a little over 900 children are looking to be adopted. According to Social Assistance Agency data, 377 children were adopted in this country in..

published on 3/28/24 8:51 AM