Parliament ratified the agreement between Bulgaria and Greece regarding the gas interconnector between the two countries, signed in Sofia on 10 October, 2019.
At both readings the decision was approved unanimously and without debates. The IGB project envisages the construction of an interconnector and gas pipeline, directly connecting the national gas transmission grids of Greece and Bulgaria and will link up with the Trans Adriatic Pipeline, ТАР. The IGB gas pipeline aims to strategically diversify the supply of natural gas to Bulgaria and the natural gas market in Southeastern Europe. The gas pipeline is 182 kilometres long, 151 of which on Bulgarian territory.
On Saturday, minimum temperatures in the country will be between 2 and 7°C, in some valleys in the south-east 0°C, in Sofia 2°C. During the day there will be cloudy weather with heavy precipitation in the eastern areas. In the western part of the..
At an extraordinary meeting, the National Assembly examines the report of the temporary parliamentary committee on the agreement between the state gas supplier Bulgargaz and Turkish energy company Botas. However, the conversation moved into the..
Caretaker Minister of Foreign Affairs Stefan Dimitrov stated that he remains in office until there is a presidential decree for his release. We recall that his replacement was requested by the caretaker PM Dimitar Glavchev a week after taking..
Italy supports Bulgaria's full-fledged membership in the Schengen area, Italian President Sergio Mattarella said. Mattarella is on a two-day visit to..
Bulgarian Caretaker Prime Minister Dimitar Glavchev has met with the Prime Minister of the Netherlands Mark Rutte , the press service of the Council of..
The Bulgarian Socialist Party will send the parliamentary report on the gas contract with the Turkish state-owned energy company Botas to the..
+359 2 9336 661