Electricity prices in Bulgaria are 50 percent higher than those in the main export markets for Bulgarian industry - Germany, Italy, France, Austria. This is stated in a letter from the Association of the Organizations of Bulgarian Employers to the Prime Minister. Industrialists are to start preparing for nation-wide protests if the government did not take measures against the artificial deficit created in order to maintain high prices. It is pointed out that some of Bulgaria's main power plants work at 25% of their capacity while at the same time electricity is exported abroad.
"The situation has deeply aggravated the competitive position on the pan-European market, which shows unacceptable and irresponsible behavior of the competent institutions," the letter reads.
After a long debate, the National Assembly decided that Kozloduy NPP- New Builds and Hyundai Engineering & Construction hold negotiations by April 15. Hyundai was shortlisted as a potential contractor for the engineering, construction and..
Bulgaria’s Parliament rejected a proposal for consideration of a draft decision for the construction of new capacities at the Kozloduy nuclear power plant. MP Delyan Dobrev, Chairman of the National Assembly Energy Committee, asked the parliament to..
The thermal power plant (TPP) ContourGlobal Maritsa East 3 - one of the two so-called American power plants - has ceased operations. The reason is the expiry of the long-term contract with the National Electricity Company for the purchase of electricity..
In the modern world, it is no longer enough to know the individual monetary units of countries and to know how their currencies relate to the Bulgarian..
The Romanian company OMV Petrom, which is part of the Austrian OMV, has taken over as operator of the Han Asparuh perimeter in Bulgaria. OMV Petrom..
+359 2 9336 661