All principal construction work on the gas interconnector between Bulgaria and Greece via Komotini has been completed. Since mid-June the pipeline equipment has been filled and tested successfully with compressed natural gas. The gas pipeline, the seven valve stations, the two gas metering stations and the dispatch centre are technically viable, construction supervision has ascertained.
The Bulgarian-Greek company ICGB, which is the investor and future operator of the interconnector issued a statement denying allegations that the pipeline is unfinished. ICGB has submitted, to the Ministry of Regional Development and Public Works, a two-stage plan for the completion of the accompanying works.
The interconnector can be made operational in test mode at the end of August, ICGB says.
She is beautiful, young and educated and has the qualities for a successful career on the catwalk or in the advertising business! But she chose to raise buffaloes in a Bulgarian village. Tsvetelina Nedkova graduated with honors from..
Progressive income taxation allows a country's resources to be shared more successfully with society. The 10% flat tax has played its role in shedding light on incomes, but it's time to replace it, Kristalina Georgieva, managing..
"I have tried to get experts into the government, to achieve continuity and the cabinet to be politically balanced," caretaker Prime Minister Dimitar Glavchev said when presenting the composition of the already active caretaker cabinet to the President...
+359 2 9336 661