All principal construction work on the gas interconnector between Bulgaria and Greece via Komotini has been completed. Since mid-June the pipeline equipment has been filled and tested successfully with compressed natural gas. The gas pipeline, the seven valve stations, the two gas metering stations and the dispatch centre are technically viable, construction supervision has ascertained.
The Bulgarian-Greek company ICGB, which is the investor and future operator of the interconnector issued a statement denying allegations that the pipeline is unfinished. ICGB has submitted, to the Ministry of Regional Development and Public Works, a two-stage plan for the completion of the accompanying works.
The interconnector can be made operational in test mode at the end of August, ICGB says.
The Romanian company OMV Petrom, which is part of the Austrian OMV, has taken over as operator of the Han Asparuh perimeter in Bulgaria. OMV Petrom replaced Total Energies as the operator of the Han Asparuh deep water perimeter in Bulgaria, according to..
Bulgaria's GDP per capita, expressed in purchasing power standards (PPS), remains the lowest in the EU, according to preliminary data from Eurostat, the official European statistics agency. In 2023, the purchasing power of European citizens ranges..
The National Assembly voted, at second reading, to give the go-ahead to cooperation with the US for the construction of reactors 7 and 8 of the Kozloduy Nuclear Power Plant. Parliament greenlights nuclear project with US technology..
She is beautiful, young and educated and has the qualities for a successful career on the catwalk or in the advertising business! But..
Joining the Eurozone later in 2025 is a possible scenario, and at this stage, it is a more likely one, Bulgarian National Bank Governor Dimitar Radev..
+359 2 9336 661