The Greece-Bulgaria gas interconnector has successfully been connected to Bulgaria’s national and transit gas transmission network.
According to the project company, connecting the infrastructure of the two independent transmission operators for Bulgaria - ICGB and Bulragtransgaz – was carried out between 16 and 17 August near Stara Zagora.
The interconnector is already successfully connected to the operators in the two neighbouring countries, and this means that the physical transmission of gas along the pipeline is technically provided for. After the mandatory non-destructive testing of the interconnector with the Bulgartransgaz network, the section will be buried. With this, all mechanical work will have been completed.
On Friday, the minimum temperatures in the country will be between 2 and 7°C, in Sofia - 1°C. Clouds will be significant, with broken clouds along the Danube. It will rain in the Rila-Rhodope area in the afternoon. Rain will cover southern Bulgaria by..
The National Assembly has approved the National Health Strategy 2030. The document sets out three main objectives: sustainable improvement of health and the living environment; ensuring health security and reducing inequalities; and efficient management..
The Sofia Court of Appeal has permanently remanded the former head of the National Customs Agency Petya Bankova and businessman Stefan Dimitrov in custody. The decision is not subject to appeal. National Customs Agency head Petya Bankova..
The MPs from the National Assembly Energy Committee have postponed by one year the full liberalization of the electricity marker. According to the..
Seventh-grader Kaloyan Geshev from the 125th High School "Boyan Penev" in Sofia became a three-time champion in mental calculation. He won first place..
President Rumen Radev did not say whether he would sign decrees for the replacement of two ministers – the Minister of Foreign Affairs and the Minister..
+359 2 9336 661