Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgarian motorways along Transport Corridor 8 to use EU funding

Photo: BGNES-archive

The Transport, Telecommunications and Energy Council has extended the Trans-European Transport Network (TEN-T). The former Pan-European Transport Corridor 8 from the Black Sea to the Adriatic Sea will be included in the new Western Balkans-Eastern Mediterranean Corridor. The construction of transport infrastructure along this axis can now be financed by EU operational programmes. There are two Bulgarian projects along the axis- the Black Sea Motorway from Varna to Burgas and the Rila Motorway from Ihtiman via Dupnitsa to North Macedonia.

Meanwhile, the Standing Committee of the Bern Convention has unanimously closed the case in Strasbourg against Bulgarian windfarms in Kaliakra which were accused of threatening bird species in the region, reports the BTA.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Record growth of mortgage loans in Bulgaria

А гrowth of 24% is reported in the number of mortgage loans in Bulgaria for the first quarter of the year, said credit consultant Tihomir Toshev in an interview with BNR. According to him, this is a record increase after 5 consecutive quarters of..

published on 4/22/24 4:08 PM

Bulgaria to open polling stations in 60 countries for 2-in-1 elections

For the early parliamentary elections in Bulgaria and the elections for European Parliament, which will be held on June 9, at this stage it is planned to open polling stations in 60 countries , reports BNR reporter Mira Stefanova. The Central Election..

published on 4/22/24 2:53 PM
Alexander Malinov

Nuclear Regulatory Agency licenses Westinghouse's nuclear fuel for Kozloduy NPP

The Nuclear Regulatory Agency has granted Kozloduy NPP permission for a phased transition to a new type of RWFA nuclear fuel for Unit 5 manufactured by Westinghouse. The changeover process will take four years.  The agency said that the process of..

published on 4/22/24 2:12 PM