Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria does not have an electric vehicle infrastructure

Photo: Georgi Korneykov, BNR

Bulgaria is among the countries of the EU with the smallest number of charging stations for electric vehicles per 100 kms. of roads, indicates a survey by the Association of Car Manufacturers.

In 10 EU countries electric car drivers have to cover more than 100 kms. of motorways and interurban roads to reach a charging point. Greece and Estonia are bottom of the list with 0.2 charging points per 100 kms. In this indicator Bulgaria has 0.8 stations per 100 kms. Top place goes to the Netherlands with 48.

Romania is also one of the countries without an electric charging infrastructure, as are Latvia and Poland. In these countries the demand for electric vehicles is under 3% of the car market.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Hristijan Mickoski

North Macedonia says there will be personnel changes in the joint commission with Bulgaria

The Prime Minister of the Republic of North Macedonia Hristijan Mickoski stated that there will be personnel changes in the Joint Multidisciplinary Commission on Historical and Educational Issues between Bulgaria and North Macedonia, MIA reports...

published on 8/26/24 5:36 PM

European Public Prosecutor's Office investigates mayor, employees of Agriculture Fund for large-scale fraud

The European Prosecutor's Office in Sofia has seized property as part of an investigation into a project worth 2.6 million euros (5.2 million leva), involving activities on the water supply network of a municipality in Bulgaria, financed by the EU...

published on 8/26/24 3:33 PM

Trucks need to wait 30 hours to cross Danube Bridge towards Romania

The queue of trucks in the area of ​​the Danube Bridge border crossing near Ruse is two kilometers long . The remaining heavy load trucks wait mainly in the buffer parking area. The stay time there is about 30 hours, BTA reported. The movement..

published on 8/26/24 2:08 PM