The Road Infrastructure Agency has launched a public procurement for the development of a conceptual design for the Montana-Sofia expressway with a tunnel under the Petrohan Pass. The length of the section is 82 km and the design speed is 120km/h. The indicative value of the design contract is EUR 3.3 million.
Until February 15 next year, offers will be accepted for the development of an extended conceptual design, complete engineering and geological studies and a detailed spatial plan for the expressway connecting the Montana bypass and the Sofia ring road. The task is to avoid crossing protected areas and to comply with all requirements in the Environmental Protection Act. The implementation deadline is 365 calendar days. The Sofia-Montana expressway with a tunnel under the Petrohan Pass is key to the national and the European transport network.
Bulgaria is among the countries with the highest shares of own property in Europe, but has the lowest share of insured homes, Nikolay Stanchev, chairman of the Management Board of the Association of Bulgarian Insurers, told BNT...
After hard days of fighting the fires, the situation in the country is under control. There is no danger of the fire on Greek territory near the Bulgarian-Greek border spreading, it was reported People whose houses have been..
There are no active wildfires on the territory of Bulgaria, said caretaker Prime Minister Dimitar Glavchev at the start of the government meeting. "Thanks to the efforts of firefighters, the military, volunteers and everyone around this table, we can..
There are no active wildfires on the territory of Bulgaria, said caretaker Prime Minister Dimitar Glavchev at the start of the government meeting...
Bulgarians drive more than their Balkan neighbours, averaging more than 21 000 km per year, according to a survey by CarVertical , reported by BGNES...
On Thursday , a cold front with clouds and precipitation will pass over the country. There will be short-term intense rainfalls with..
+359 2 9336 661