The Road Infrastructure Agency has launched a public procurement for the development of a conceptual design for the Montana-Sofia expressway with a tunnel under the Petrohan Pass. The length of the section is 82 km and the design speed is 120km/h. The indicative value of the design contract is EUR 3.3 million.
Until February 15 next year, offers will be accepted for the development of an extended conceptual design, complete engineering and geological studies and a detailed spatial plan for the expressway connecting the Montana bypass and the Sofia ring road. The task is to avoid crossing protected areas and to comply with all requirements in the Environmental Protection Act. The implementation deadline is 365 calendar days. The Sofia-Montana expressway with a tunnel under the Petrohan Pass is key to the national and the European transport network.
For the third year in a row, the agricultural exhibition "Day on the Field" will be held in the region of Dobrich. The exhibition is organised by the Dobrudzha Union of Grain Producers and aims to gather farmers, producers of seeds,..
At night, mainly in the north-eastern regions Bulgaria, there will be temporary increases in cloudiness and short rainfalls with thunder. The sky will be mostly clear in the rest of the country. On Tuesday , the air mass over..
A man and a child have died after they were struck by lightning in the area of Mount Zhultets near Mount Botev in the Central Balkan Mountains. The alert was sent to the mountain rescue service at around 13.30 by a child who was with them, reports BNR..
There are no active wildfires on the territory of Bulgaria, said caretaker Prime Minister Dimitar Glavchev at the start of the government meeting...
Bulgarians drive more than their Balkan neighbours, averaging more than 21 000 km per year, according to a survey by CarVertical , reported by BGNES...
On Thursday , a cold front with clouds and precipitation will pass over the country. There will be short-term intense rainfalls with..
+359 2 9336 661