Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

ContourGlobal Maritsa East 3 TPP shutdown after contract with NEC expires

No layoffs at this stage, says CEO

Photo: BTA

The thermal power plant (TPP) ContourGlobal Maritsa East 3 - one of the two so-called American power plants - has ceased operations. The reason is the expiry of the long-term contract with the National Electricity Company for the purchase of electricity at fixed prices. "The shutdown is temporary, there will be no layoffs at this stage," CEO Vassil Shtonov told Stara Zagora media Divident.eu. The cost of electricity produced by Maritsa East 3 is 125 euro per MWh - far higher than prices on the Bulgarian Energy Exchange.

After the shutdown of the country's second largest thermal power plant, the state energy operator assured that the electricity supply system was working properly. Bulgaria's coal-fired power plants AES Galabovo TTP, Maritsa East 2 TTP and Bobov Dol are still in operation, with Bobov Dol TPP on the open market.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Standard & Poor's confirms Bulgaria's rating and positive outlook

The international rating agency Standard & Poor's (S&P Global Ratings) has affirmed Bulgaria's 'BBB/A-2' long-term and short-term foreign and local currency sovereign credit ratings. The rating outlook remains positive.  If a stable..

published on 5/25/24 10:50 AM

Businesses want to negotiate the import of highly educated specialists from India

In the next 3 to 5 years, Bulgaria will experience a shortage of more than 250,000 specialists with higher education. For the past 8 years, Bulgaria has missed the opportunity, which a number of EU countries have taken advantage of, to conclude an..

published on 5/22/24 9:18 AM

BNB tightens control over mortgage lending

The Governing Council of the Bulgarian National Bank (BNB) has ordered banks in the country to apply a minimum set of 6 indicators for monitoring credit standards when granting and renegotiating loans secured by residential real estate . The aim is to..

published on 5/21/24 8:53 AM