Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Kiril Petkov:

PP-DB will not negotiate with "Vazrazhdane" for a new government

Kiril Petkov
Photo: EPA/BGNES

From his Facebook profile, the co-chairman of "We Continue the Change" Kiril Petkov announced that the PP-DB coalition will not negotiate with "Vazrazhdane" to form a cabinet. He defined as "media suggestions" the claims that such talks are possible.

Speculations about possible negotiations between the two formations began after an interview with Kiril Petkov, in which he stated that negotiations could be held when "Vazrazhdane" apologized for the insults and proved that it is not pro-Russian. The MP from "Vazrazhdane" Tsoncho Ganev told BNT that there were unofficial talks with PP-DB.

According to Kiril Petkov, there are two potential majorities in the current parliament - GERB and DPS; "Vazrazhdane", BSP, "Velichie", ITN, but PP-DB cannot be part of them, because it is an anti-corruption and pro-European coalition.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Classic car parade takes place in Burgas today

The 17 th classic car and motorcycle parade is to take place in Burgas’ Primorski Park from 10 AM until 2.30PM today. More than 150 collectors from Burgas and the country will take part, Dimo Dzhambazov, chair of the Retro motor club, organizer of..

published on 7/6/24 7:55 AM

Weather forecast: Over the weekend temperatures will rise

On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..

published on 7/5/24 6:45 PM

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..

published on 7/5/24 6:13 PM