Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a subsequent leak from a steam generator. After the repair work, tests and trials of the equipment were conducted in accordance with the safe exploitation requirements. The tests conducted by independent experts from the Nuclear Regulatory Agency confirmed the reliability of the equipment and the systems, the NPP has announced. The loading of the reactor will be carried out in stages, in accordance with the technological regulations. Kozloduy NPP’s reactor No. 5 is functioning according to schedule, the nuclear power plant states further.
Because of a staff technological error, during the repair work, the executive director of the power station Valenin Nikolov was replaced.
Bulgarian students have won 4 medals at the International Chemistry Olympiad in Saudi Arabia , held from 21 to 30 July. They won one gold, one bronze and two silver medals. The gold was won by 12th grader Victor Lilov , the Science Olympic..
Tsar Assen village in the region of Silistra marks Gardeners’ Day today, dedicated to the efforts of all gardeners and farmers who help put food on the table. By a tradition, dozens of fruit and vegetable growers from the region will present..
The parliamentary group of ITN announced that today it is starting negotiations with the other political forces and independent MPs within the framework of the 50th National Assembly, after receiving the third and final exploratory mandate to form..
The BG-ALERT system has issued an evacuation warning for the residents of five villages in the municipality of Strumyani due to the large fire that..
The range of the fire on the Bulg arian-Greek border has increased overnight. The fire has crossed the protective clearing over 2 places into Bulgarian..
The situation related to the two fires raging in Maleshevo and Slavyanka mountains is complicated. Both fronts remain active. About..
+359 2 9336 661