The money necessary for the construction of the gas interconnection between Bulgaria and Greece are estimated at EUR 220 million, Bulgaria’s Minister of Energy Temenuzhka Petkova announced. The Energy Ministry aims at fulfilling the gas interconnection project within the frameworks of the planned road map, Minister Petkova added. The contractor under that project would be chosen in full transparence and with conformity with the Public Procurement Act, Temenuzhka Petkova further pointed out. According to initial plans, the interconnector should start functioning by mid 2018.
Animal protection organizations protested in front of the Sofia Municipality, demanding humane treatment in municipal shelters. Environmentalists point out that the dogs are suffering in the cold, crammed into shared cages where they end up eating..
The repair of the second hydro unit at the Chaira Pumped Storage Hydro Power Plant has been completed, reported BNT. Caretaker Minister of Energy Vladimir Malinov is expected to inspect the facility in the presence of caretaker Premier Dimitar..
The Presidency of the Renew Europe group in the European Parliament unanimously decided to recommend the termination of membership of the Group of the Movement for Rights and Freedoms (DPS) party, following the actions of its leader, Delyan Peevski...
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
12 settlements in Smolyan district are without electricity after the heavy snowfall yesterday. Settlements in the municipalities of Smolyan, Devin and..
Representatives of 4 clubs of the Macedonian Patriotic Organization (MPO) in North America met at the Church of the Holy Spirit in Youngstown. The host..
+359 2 9336 661