Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
Bulgaria will be the intersection point of two NATO logistics transport corridors. Under an agreement signed at the NATO Summit in Washington, Italy, Albania, North Macedonia and Bulgaria will cooperate within the Pan-European Transport Corridor No...
Most political forces in parliament commented on what is happening in the Movement for Rights and Freedoms (DPS) as internal problems of DPS. According to the chairman of the GERB-SDS parliamentary group, Boyko Borissov, the fact that there is a..
After 17 MPs from the Movement for Rights and Freedoms, MRF, were expelled, among them the party’s other co-chair Dzevdet Chakarov, MRF MP Ahmed Vranchev expressed, in written form, a desire to leave the Movement’s parliamentary group. DPS..
The European Commission has approved state aid amounting to EUR 142 million (BGN 278 million) to support the energy sector, BNR’s correspondent in..
President Rumen Radev is to hand the second governing-forming mandate next week. ''I expect We Continue the Change - Democratic Bulgaria (PP-DB) to..
13 bands from abroad will perform on the big stage of the 4 th edition of Midalidare - Rock in the Wine Valley , 12-14 July, alongside the..
+359 2 9336 661