Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

BAS: Belene N-plant possible to build under parameters identified by us

Photo: BGNES

With an investment cost of less than EUR 10.5 billion, with a ratio of 70:30 for attracted and own capital and an interest rate below 4.5%, the Belene NPP project is viable. This is the conclusion in an analysis made by the Bulgarian Academy of Sciences that has been commissioned by the Bulgarian Energy Holding.

The project would become significantly more viable in case the state is involved. In the region there is a shortage of base capacity of about 2000 MW. The worst option is if nothing is done on the Belene project, the Bulgarian Academy of Sciences said.

"The ultimate decision for Belene should only be made after a broad discussion of this analysis”, Energy Minister Temenuzhka Petkova commented at the presentation of the report. She stressed that the Belene N-plant decision should be made quickly but not hastily.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Temperatures to drop slighly, clouds expected on Tuesday

On Tuesday until noon, sunny weather will prevail over most area. In the afternoon there will be more significant increases in cloudiness over the northern and eastern parts of the country. In places, mainly in North-Eastern Bulgaria, it will rain and..

published on 8/26/24 7:15 PM
Hristijan Mickoski

North Macedonia says there will be personnel changes in the joint commission with Bulgaria

The Prime Minister of the Republic of North Macedonia Hristijan Mickoski stated that there will be personnel changes in the Joint Multidisciplinary Commission on Historical and Educational Issues between Bulgaria and North Macedonia, MIA reports...

published on 8/26/24 5:36 PM

European Public Prosecutor's Office investigates mayor, employees of Agriculture Fund for large-scale fraud

The European Prosecutor's Office in Sofia has seized property as part of an investigation into a project worth 2.6 million euros (5.2 million leva), involving activities on the water supply network of a municipality in Bulgaria, financed by the EU...

published on 8/26/24 3:33 PM