The construction of Struma motorway section between the towns of Sandanski and Kresna is two months ahead deadlines, engineer Temenuzhka Filipova from the Road Infrastructure Agency told BNR. We are doing daily control on the quality of the construction works, engineer Filipova pointed out. No other motorway in Bulgaria was subject to such monitoring before. Four laboratories are testing the quality of the materials used in the construction of Struma motorway, Temenuzhka Filipova went on to say. This section of Struma motorway is 24 kilomneters long and 29 meters wide. The cost of this section was estimated at EUR 118 million and construction works have to end in 2019.
An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..
Monday will be mostly sunny with scattered high clouds. The lowest temperatures will be between 0° and 5°C; in Sofia - about 1°C, and the highest will reach between 13° to 18°C; in Sofia - about 14°C. In the mountains it will..
On the first day of the 51st parliament, ITN will initiate the collection of signatures for submitting a complaint to the Constitutional Court concerning the partial cassation of the elections, party leader Slavi Trifonov announced on..
Slavi Trifonov, leader of There Is Such a People (ITN) declared he would sign the declaration of We Continue the Change/Democratic Bulgaria (PP/DB),..
The recordings from 65 cameras, which streamed the counting of the ballots on election night online, have gone missing, according to a report by the..
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second..
+359 2 9336 661