Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Gas hub feasibility study starts

Photo: BGNES

Bulgarian gas operator Bulgartransgaz and Bulgarian-Swiss consortium AF-EMG Consult have signed a contract for the feasibility study of the planned Balkan gas hub.

Within a period of 40 days the consortium will present an interim report, while a comprehensive survey will be prepared in a period of 110 days. The feasibility study will detail the commercial and technical viability of the project and will identify the exact business model for its realization, as well as target markets, demand and supply sources of natural gas.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Delyan Peevski: We will not remain indifferent to North Macedonia’s refusal to include Bulgarians in the constitution

"The newly elected Prime Minister of the Republic of North Macedonia chose confrontation and trampling over European principles and from the highest parliamentary rostrum made it clear that he intends to divert the country from its..

published on 6/25/24 11:20 AM

President holds second round of consultations over cabinet formation

On the second day of consultations with President Rumen Radev over forming a government, the leader of "Vazrazhdane" Kostadin Kostadinov expressed confidence that it was possible to have a cabinet within the new National Assembly. He..

published on 6/25/24 10:24 AM
Atanas Atanasov

PP-DB want prime minister to tell the parliament why snipers are guarding Boyko Borissov’s home

The parliamentary group of PP-DB will insist for a hearing of the caretaker Prime Minister and the Minister of the Interior in the National Assembly over the reasons for increasing the level of protection of the chairman of GERB,..

published on 6/25/24 9:00 AM