Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Ministry of Tourism finds violations on the Black Sea coast

Since the beginning of the summer tourist season on the Black Sea coast, more than 170 inspections have been carried out and six violations have been detected, four of which have been the subject of administrative acts, said in Burgas Ivan Videlov,..

published on 6/29/24 4:23 PM
Iliana Iotova in Belogradchik, 29 June 2024

Vice President Iliana Iotova: There is a danger of serious political crisis

Vice President Iliana Iotova has described the situation in Bulgaria as "extremely unstable". "There is a great danger of a serious political crisis that could make it impossible for us to cope with the Recovery and Resilience Plan, with the operational..

published on 6/29/24 3:05 PM
Bishop Sioniy (left)

Bell ringing welcomes the relics of St. Euthymius of Tarnovo in Saint Alexander Nevsky Cathedral

Bishop Sioniy, the abbot of the Troyan and Bachkovo monasteries, brought the relics of the Holy Patriarch Euthymius of Tarnovo to the Patriarchal Cathedral of St. Alexander Nevsky, which announced the event with a bell ringing. The shrine was..

published on 6/29/24 1:05 PM