The money spent so far on the project for a second Bulgarian nuclear power plant in Belene cannot be restored unless a power plant is built, Bulgaria’s Minister of Energy Temenuzhka Petkova said at the ATOMEXPO International Forum in Sochi, Russia. The Bulgarian cabinet will soon request from the National Assembly a mandate to carry out the project. According to the plans of the Bulgarian government, the nuclear power plant should be built on a market principle and without state guarantee. If the Bulgarian cabinet receives a mandate from the country’s Parliament, the procedure for choosing strategic investor or investors in Belene NPP can start by the end of 2018, Minister Petkova contends.
The Director of the Agency for Bulgarians Abroad, Raina Mandzhukova, provided books free of charge for the fund of the Bulgarian Department in the Library of Congress in the US , the agency announced. The donation includes specialized literature for..
The Bulgarian Embassy in the USA has no reports about the presence of Bulgarian citizens on board the plane that crashed in Washington on the night of January 30, the Bulgarian Foreign Ministry announced. The Bulgarian diplomatic mission in..
Bulgaria's Minister of Tourism, Miroslav Borshosh, has held a series of meetings with business organizations in the tourism industry . The main topics of the talks were the need to introduce a Tourist Guarantee Fund, the fight against the gray sector..
Navigation Maritime Bulgare (Navibulgar) is conducting its own investigation into the case involving the Vezhen ship, announced Navibulgar CEO Captain..
Seven years after buying the Denny ice cream factory in Veliko Tarnovo, London-based multinational Unilever is closing the plant. The company did not give..
During the night, the cloud cover will be significant. There will be fog in many places in the plains and valleys. The weather will be almost calm in..
+359 2 9336 661