Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prime Minister Borissov in Thessaloniki: "Achieving connectivity in the region is true challenge"

Photo: BGNES

The Prime Ministers of Bulgaria, Romania and Greece - Boyko Borissov, Viorica Dăncilă and Alexis Tsipras together with Serbia's President Alexander Vucic have agreed during a four-way meeting in Thessaloniki to work on a common infrastructure ring linking the highways, railroads and ports of the four countries.

Following the meeting of the High Level Cooperation Council, PM Borissov pointed out that the Bulgarian presidency of the Council of the EU was actually a Balkan presidency, and during it each country in the region was well presented. Focusing on the topic of development of infrastructure and transport connectivity of the region, Borissov commented that purposeful work in this direction was "real Balkan challenge".

The other participants in the Thessaloniki Summit have welcomed the results of the Bulgarian Presidency of the Council of the EU.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM