The National Electric Company and Russia’s nuclear power equipment and service exporter Atomstroyexport signed an agreement for storage of the nuclear equipment for Belene NPP. The whole activity related to the storage of the nuclear equipment will be done by the National Electric Company under the supervision of the manufacturers and representatives of Atomstroyexport. The contract was signed for five years with an option to be extended if necessary. However, the National Electric Company hopes that a strategic investor of the second nuclear power plant will be chosen by then and that all contracts will be transferred to that company.
GERB/SDS has withdrawn its nomination for president of the National Assembly. In the upcoming 8 th attempt to elect a president of parliament, there will be 3 candidates. Vazrazhdane is once again nominating Petar Petrov. There Is Such a People (ITN)..
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
During the night it will be cloudy with rainfalls in the western and central regions of Bulgaria, as snowfalls are possible in the..
+359 2 9336 661