Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Interest in Bulgaria’s energy projects up

Photo: BGNES

General Electric sent a letter with the intention to participate at the competition for construction of Belene nuclear power plant, Bulgaria’s Minister of Energy Temenuzhka Petkova announced. Macedonia and Montenegro are also interested in participating in the project. The third phase of the market test for the capacity of the Turkish Stream gas pipeline has ended successfully. Three suppliers have shown interest to fill 100% of the gas pipe section from the Bulgaria-Turkey border to the Bulgaria-Serbia border, Minister Petkova also announced and added that other companies will be able to book the gas facilities after the launch of the gas pipeline which is in line with the EU requirement for free access and competition. The annual profit of Bulgartransgaz from the extension of the Turkish Stream via Bulgaria is expected to exceed EUR 185 million.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria’s Parliament adopts conclusively the Law on the Introduction of the Euro

Without discussion and debates, the parliament adopted conclusively the Law on the Introduction of the Euro in Bulgaria. 167 MP from GERB-SDS, the Movement for Rights and Freedoms (DPS) and We Continue the Change-Democratic Bulgaria voted in..

published on 8/8/24 8:40 AM
Paul Cameron in Burgas

Burgas Airport welcomes its one millionth passenger

Paul Cameron from London has turned out to be the one millionth passenger for 2024 at Burgas Airport, and his landing turned into a real celebration, BNT reported.  He and his wife Cindy arrived on a charter flight from Gatwick Airport and were..

published on 8/7/24 10:27 PM

Belene equipment will not be used for Kozloduy NPP

With the votes of GERB-SDS, PP-DB and MRF, the National Assembly rejected the proposal of BSP for Bulgaria that part of the equipment for Belene NPP be used to replace the 3rd steam generator of the 6th unit of Kozloduy NPP, which is constantly failing...

published on 8/7/24 6:02 PM