Corinth Pipeworks, a part of Cenergy Holdings, has won the 58.2m-euro tender for delivery of pipes for construction of the gas interconnector between Bulgaria and Greece.
The Greek pipe maker was one of the three pre-selected candidates, one of which withdrew from the procedure, while the other did not meet the technical requirements. Bulgaria plans to start using the 182-kilometer gas pipeline from 2020 onwards to import Azerbaijani gas and thus end its almost full dependence on Russian natural gas.
Caretaker Prime Minister Dimitar Glavchev stated that he will accept a proposal to be caretaker PM again if President Rumen Radev assigns him this position. President of Bulgarian Parliament Raya Nazaryan refuses to be caretaker PM “I..
A plasterboard ceiling of a wedding hall came crashing down on top of 150 guests in Kardzhali. Seven people have sustained non-life threatening injuries during the incident which took place on Monday night, among them one child. At the time of the..
A new flare-up of the big wildfire on the Greek side of Slavyanka mountain has crossed the border into Bulgaria, extending the perimeter of the fire over 120 hectares of Bulgarian territory. Heavy bulldozers are making wide clearings so as to..
Caretaker Prime Minister Dimitar Glavchev stated that he will accept a proposal to be caretaker PM again if President Rumen Radev assigns him this..
A new flare-up of the big wildfire on the Greek side of Slavyanka mountain has crossed the border into Bulgaria, extending the perimeter of the fire..
The traditional swim across the Danube River near Silistra will take place at 9:00 am on August 10. Those wishing to participate can register just..
+359 2 9336 661