Russian state-owned corporation Rosatom has been planning to take part in the tender for the construction of second Bulgarian nuclear power plant - Belene. This was announced by Rosatom Director Alexei Lihachov at the International Economic Forum in St. Petersburg. In 2006, Atomstroyexport, part of Rosatom, won an international tender for the construction of two units of this nuclear power plant and equipment was delivered to the Belene site. In 2009 the project was suspended and in March 2012 Sofia cancelled the construction of the plant. This year, however, a tender for the construction of the plant was announced once again.
Over the next 24 hours the weather will continue cloudy, with rain mostly in the Southwestern half of the country and sleet in high plains. The precipitation over Mounts Rila and the Rhodopes will be considerable. There will be a moderate, in..
The Bulgarian Food Bank’s Kilogram of Kindness food drive, is collecting food for the needy for the 12th consecutive time. Four to seven tons of food with a longer shelf lifeis expected to be collected – such as rice, lentils,..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common currency, the euro, both in the EU as a whole (74%) and in the euro area (81%). In Bulgaria,..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
+359 2 9336 661