Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Unit 5 of Kozloduy NPP connected to Bulgaria’s energy system

Photo: BGNES

The scheduled testing of Unit 5 of Kozloduy NPP has been completed successfully, confirming the operability of the equipment in the conditions of upgraded power capacity in different modes of operation.

All activities throughout the different stages of the approved testing programme were completed according to schedule, and on 14 July, the unit was connected to the country’s energy grid. The test results will be summarized in a report which will be submitted to the Nuclear Regulatory Agency. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Homeless people in Ruse to receive a free hot meal

For the 13th consecutive year, homeless people in the town of Ruse will receive a free hot meal during the winter months. The social kitchen of the Bulgarian Red Cross opens its doors again in the biggest Bulgarian city on the Danube River. It has a..

published on 11/25/24 12:02 PM

Ministry of Transport proposes the division of railway routes into three lots

Experts from the Ministry of Transport and Communications are proposing the division of Bulgarian State Railways (BDZ) into three lots. According to them, this is a first step toward a more efficient and modern railway transport system, reported..

published on 11/25/24 11:48 AM

The flu season is expected to peak at the end of December and the beginning of January

The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana Nikolova clarified that there are currently isolated positive cases of influenza. COVID-19 also..

published on 11/25/24 10:26 AM