The scheduled testing of Unit 5 of Kozloduy NPP has been completed successfully, confirming the operability of the equipment in the conditions of upgraded power capacity in different modes of operation.
All activities throughout the different stages of the approved testing programme were completed according to schedule, and on 14 July, the unit was connected to the country’s energy grid. The test results will be summarized in a report which will be submitted to the Nuclear Regulatory Agency.
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra 2025" exhibition in the halls of the International Fair in Plovdiv, BTA reports. This year's..
On Tuesday, the lowest temperatures will be between minus 5 and 0°C; in Sofia - around minus 5°C. It will remain cold and cloudy with snowfalls over most of the country and rainfall in the southeastern regions. The snow cover will..
Bulgaria’s President Rumen Radev named Sofia Airport after the Apostle of Freedom Vasil Levski, the press secretariat of the head of state announced. Thus, its official name becomes Vasil Levski Sofia Airport. According to the Constitution, the Head of..
Kristiyan Vladov and Stefan Kyurkchiev of the Plovdiv Museum of Natural History are working on a project to bring live fish from the southern Arctic..
The one-year anniversary of the death of Russian opposition leader Alexei Navalny was marked with a memorial service in Sofia's St Nedelya Cathedral. It..
Bulgarian Finance Minister Temenuzhka Petkova will travel to Brussels to provide an update on Bulgaria’s progress towards euro area accession. The..
+359 2 9336 661