The extension of the Turkish Stream gas pipeline will pass through Bulgaria, not Greece, Russia’s Energy Minister Alexander Novak told journalists today at the sitting of the Russia-Turkey Intergovernmental Commission on Trade and Economic Cooperation in Antalya. The gas pipeline which has to connect Russia and Turkey via the Black Sea will start functioning on January 1, 2020. The extension which will pass through Bulgaria, Serbia and Hungary is expected to start functioning in stages. The first gas deliveries to Bulgaria are expected to be made in 2020. The pipeline will have the capacity to transfer 15.75 billion cubic meters of gas per year.
GERB/SDS has withdrawn its nomination for president of the National Assembly. In the upcoming 8 th attempt to elect a president of parliament, there will be 3 candidates. Vazrazhdane is once again nominating Petar Petrov. There Is Such a People (ITN)..
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
During the night it will be cloudy with rainfalls in the western and central regions of Bulgaria, as snowfalls are possible in the..
+359 2 9336 661