The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
The Supreme Administrative Court has overturned as unlawful the Central Election Commission's refusal to register the Movement for Rights and Freedoms - New Beginning coalition (one of the two factions of the DPS) for the 27 October parliamentary..
The Commission for Consumer Protection has ordered the immediate withdrawal from the market of two products known as energy sniff, which are inhaled through the nose and are an alternative to energy drinks. The products have been identified as a serious..
With the votes of GERB, We Continue the Change (PP-DB) and the Movement for Rights and Freedoms (DPS), Parliament decided to extend by 180 days the negotiations between the Bulgarian Energy Minister and his Ukrainian counterpart on the sale to Ukraine of..
Defence Minister Atanas Zapryanov has cancelled the air show at the Graf Ignatievo Air Base after an L-39 ZA military transport plane crashed, the..
The Supreme Administrative Court rejected the appeal of the coalition around Ahmed Dogan - "Democracy, Rights and Freedoms - DPS"..
At a Bulgarian-Chinese business forum in Sofia, President Rumen Radev pointed out the advantages of the business environment in..
+359 2 9336 661