The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
A record number of contestants from 8 countries are to take part in today’s Kodzha Kaya mountain marathon. Its 6 th edition of hosted by Bilka village in the Eastern portion of the Balkan range. By a tradition the marathon begins at dawn..
On Sunday the weather will be predominantly sunny, with cumulus clouds forming in the East in the afternoon though there is a slim chance of rain. There will be a light to moderate wind from the East-Northeast. Minimum temperatures 5-10° C., for..
As the active season is set to begin, the Ministry of Tourism started checks into unfair practices in organized tourist travel. Two of the tour operators checked so far have not provided a certificate for carrying our tour operator activity and..
A new complex in the village of Samoranovo, which includes a prison without bars based on the Norwegian model, a training center for prison officers, etc...
On Tuesday, lows will be between 7 and 12°C, 8°C in Sofia. During the day, rain will start to decrease from the north to central and eastern Bulgaria,..
Bulgaria should further develop its approach to dealing with energy poverty and indicate concrete steps for its reduction - this is stated in the..
+359 2 9336 661