Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Scheduled repair starts of Unit 5 of Kozloduy NPP

Photo: Radio Vidin

Today, the planned annual repair of one of the two operating units of the only nuclear power plant in Bulgaria, Kozloduy NPP. This is unit number 5. During the repair period, equipment and systems will be subjected to regular maintenance operations, as well as refueling of the reactor with fresh nuclear fuel. The planned modifications related to the long-term operation of the nuclear facility will be implemented. Repairs are expected to be completed by the second half of May.

The sixth unit of Kozloduy NPP is operating at full capacity.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Kristian Vigenin

If BSP receives the third mandate, it will try to form expert cabinet (UPDATED)

The return of the second mandate was not unexpected, deputy chairman of the BSP Kristian Vigenin said. According to him, forming a government within the framework of the 50th parliament is increasingly difficult to achieve...

published on 7/22/24 2:28 PM

PP-DB returns the second mandate immediately after it was handed over

President Rumen Radev handed over the second exploratory mandate to form a government to the second largest parliamentary group in the 50th National Assembly - "We Continue the Change" - "Democratic Bulgaria" coalition (PP-DB).  At the handing..

published on 7/22/24 12:14 PM

Caretaker government signs contract for East-West energy corridor feasibility study

A contract between the US Trade and Development Agency and the Electric Power System Operator for the feasibility study for the East-West Energy Corridor was signed at the Council of Ministers.  The funding, amounting to USD 1.2 million, is..

published on 7/22/24 11:26 AM