Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

ICGB directors inspect construction of Greece-Bulgaria gas pipeline

Photo: www.icgb.eu

The executive directors of the ICGB project company from Bulgaria and Greece, Teodora Georgieva and Konstantinos Karayanakos, made an on-spot inspection of the construction of the gas interconnector between Greece and Bulgaria. 

The Greece-Bulgaria interconnector has a planned gas transmission capacity of 3 billion cubic metres per year with the option to reach 5 billion cubic metres. The total length of the route is 182 km, as 150 km are on the territory of Bulgaria. Nearly 110 km of the terrain have already been cleared and the route has been prepared. More than 100 km of linear laying pipes have been delivered. All teams work actively. 
There has been significant progress despite complications from the coronavirus epidemic, the directors said.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rumen Radev

President Radev: Europe should support the US’ efforts for a peaceful settlement in Ukraine

To insist on seeking a military settlement to the conflict in Ukraine is a losing venture. Europe should support the efforts of the US to find a better solution, said President Rumen Radev at the Chief of Defence Annual Conference in Sofia. At..

published on 2/25/25 2:34 PM
PM Rosen Zhelyazkov

PM Zhelyazkov reiterates no Bulgarian troops will be sent to Ukraine

“There is no change, Bulgarian troops are not going to be sent to Ukraine,” said PM Rosen Zhelyazkov in a comment about the meeting between US President Donald Trump and French President Emmanuel Macron at the White House. “The institutions in..

published on 2/25/25 1:17 PM
Ministry of Defence building

Bulgaria to take part in common procurement of IRIS-T air defence systems and CAESAR howitzers

Bulgaria is to take part in common procurement procedures in the sphere of defence at an EU level, under projects for the acquisition of IRIS-T air defence systems and CAESAR self-propelled howitzers. The Ministry of Defence applied for and..

published on 2/25/25 1:04 PM