Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Energy minister: There is no way we can give up on the Belene NPP project

Temenuzhka Petkova
Photo: BGNES

“There is no way the country can give up on building new units for the Belene NPP project. One of the reasons is that the coal-fired power stations should be done away with and replaced by emission-free options. The implementation of the project (whose design is Russian – editorial note) continues by a decision of the Bulgarian National Assembly,” said Energy Minister Temenuzhka Petkova in an interview for Nova TV.

Regarding the planned construction of Unit No. 7 of the existing Kozloduy NPP, Minister Petkova stated that it is Bulgaria’s main aim to diversify its energy resources.

“We are turning our attention to USA to see which the latest technologies are which they are working with,” Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

GERB will not sign PP/DB’s declaration for a cordon sanitaire around Delyan Peevski, Boyko Borissov says

During the regional GERB youth academy in Targovishte, GERB leader Boyko Borissov stated that GERB would not sign the declaration of We Continue the Change/Democratic Bulgaria (PP/DB) for a cordon sanitaire around Delyan Peevski. PP/DB calls..

published on 11/30/24 3:17 PM

Protest in Velingrad in support of farmers with flocks which tested positive for sheep and goat plague

A protest took place in Velingrad in support of the farmers whose flocks of sheep have been quarantined because of positive tests for sheep and goat plague. To stop the spread of the disease, access to the area around the farms has been..

published on 11/30/24 1:10 PM

EC gives Bulgaria 6 months to introduce necessary reforms under the Recovery and Resilience Facility, or it may lose EUR 653 million

Bulgaria will be given six months to carry out the necessary reforms connected with the liberalisation of the energy market , otherwise it stands to lose EUR 653 million which it should receive as a second payment under the Recovery and..

published on 11/30/24 11:55 AM