The construction of the first seventeen kilometer-long section of Europe motorway connecting the towns of Dragoman and Slivnitsa has been completed, Road Infrastructure Agency announced, BTA informs. Construction works ended six months ahead of schedule. The section is part of the Pan-European corridor London-Budapest-Belgrade-Sofia-Plovdiv-Istanbul-Calcutta, which is the shortest road connecting Western Europe, the Near East and the Middle East.
Europe motorway connecting Kalotina border crossing and Bulgaria’s capital Sofia is 48 kilometers long. Construction of the 14.5 kilometer section between the Bulgaria-Serbia border and the town of Dragoman continues.
The third section of the motorway between Slivnitsa and Sofia will be 16 kilometers long. The technical design of the new section is being prepared.
Eurogroup finance ministers confirmed on Monday that the euro- lev exchange rate would remain unchanged after Bulgaria joins the eurozone. This was announced by President of the Eurogroup Paschal Donohoe. Today, the European Parliament in Strasbourg..
During its plenary session in Strasbourg today, the European Parliament is scheduled to vote on Bulgaria’s accession to the eurozone on 1 January 2026. Today, the EU Council in its ECOFIN format (which includes the countries that have adopted..
On Tuesday, minimum temperatures will range from 18 to 25°C . In Sofia, it will be around 19°C. It will be sunny and hot during the day. Cumulus clouds will develop in the afternoon, but there is only a low chance of rain. There will be light to moderate..
A new lane for heavy trucks over 12 tons will be opened at the Danube Bridge in Ruse, announced Ruse Regional Governor Dragomir Draganov. The initiative..
On July 7, the Bulgarian National Bank (BNB) puts into circulation a silver commemorative coin titled "175 Years Since the Birth of Ivan Vazov", BNB..
Gorna Oryahovitsa is the largest non-district town in Northern Bulgaria. It is located near Bulgaria’s old capital, Veliko Tarnovo, and is an important..
+359 2 9336 661