Bulgaria’s gas transferring system has been modernized and allows reverse flow of gas. It is equipped with the best compressors that allow us to transport gas in all directions, Bulgaria’s Premier Boyko Borissov, who inspected the Rasovo compressor station which is being constructed along the route of the Balkan Stream pipeline, announced.
The compressor stations will be equipped by compressors manufactured by an American company. Both the gas pipeline and the adjacent facilities will be part of Bulgaria’s gas transferring system, the government’s press center reminds. The project aims to reinforce Bulgaria’s role as leading commercial distribution center in the region and the European Union.
President Rumen Radev handed over the second exploratory mandate to form a government to the second largest parliamentary group in the 50th National Assembly - "We Continue the Change" - "Democratic Bulgaria" coalition (PP-DB). At the handing..
A contract between the US Trade and Development Agency and the Electric Power System Operator for the feasibility study for the East-West Energy Corridor was signed at the Council of Ministers. The funding, amounting to USD 1.2 million, is..
Residents of the village of Kavrakirovo, near Petrich, came out in protest because of a proposal submitted to the municipal council of the municipality of Petrich, which affects nearly 100 ha of forest land . According to the protesters, it is about the..
A state of emergency remains in force in seven villages in the border municipality of Bolyarovo. The fight against the fire at the village of Voden..
A fire has started in Greece a kilometre and a half from the Bulgarian border and is slowly moving towards it. The fire is located in an extremely..
A total of 60 officers from the Bezmer and Kabile units are on the ground with equipment for firefighting, Bulgaria's Defence Minister Atanas Zapryanov..
+359 2 9336 661