The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
The Bulgarian National Bank held an auction for the sale of securities with 3-year maturity at a 3% interest rate. At the auction, the Ministry of Finance offered bonds worth EUR 150 million. Interest will be paid once in 6 months, with the loan..
The Bulgarian National Bank published a review of measures aimed to address the risks to the banking system, including those stemming from loans secured by residential real estate. ''Such concerns are well-founded given the situation in the real..
The international rating agency Standard & Poor's (S&P Global Ratings) has affirmed Bulgaria's 'BBB/A-2' long-term and short-term foreign and local currency sovereign credit ratings. The rating outlook remains positive. If a stable..
+359 2 9336 661