The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
According to the European Commission's spring economic forecast for this year, inflation in Bulgaria is expected to reach 3.1 % in 2024 and 2.6 % in 2025 . The anticipated downtrend in external prices is expected to limit inflation in both energy and..
In March 2024, 1,518 people in Bulgaria had deposits of more than BGN 1 million, while in March 2023, 1,277 Bulgarians had such deposits, according to the latest BNB data. Deposits between BGN 200 thousand and BGN 500 thousand grew the most..
In the first quarter of 2024, the country’s real GDP growth is expected to accelerate, which is a prerequisite for similar annual dynamics, the Bulgarian National Bank said in its regular economic review. The GDP growth is mainly due to the..
+359 2 9336 661