Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgarian energy regulator: Gas interconnector with Greece will not be ready until June 2022

Ivan Ivanov
Photo: BGNES

The Gas Interconnector Greece-Bulgaria through which gas should be delivered from Azerbaijan, will not be ready by the middle of 2022, said the chairman of the Bulgarian Energy and Water Regulatory Commission, Ivan Ivanov.

"We agreed on the request received from the company ICGB for extension of the term for commissioning of the interconnector from Greece's Komotini to Bulgaria's Stara Zagora until June 30, 2022. This is the foreseeable period during which the interconnector Nea Mesimvria - Siderokastro - Kulata will have to be used for alternative deliveries. And they are absolutely necessary for Bulgaria, because they can have a positive impact on consumers regarding the price of natural gas". 



The capacity for deliveries on the current interconnector is reserved only until September, Ivanov warned.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

China hopes to see more Bulgarian products on the tabl

Cooperation between Bulgaria and China in the field of agriculture and food is very active and is constantly expanding. This was stated at a meeting in Sofia between Deputy Minister of Agriculture and Food Lozana Vasileva and Wan Lejun, Chief Animal..

published on 3/20/25 6:23 PM
Odile Renaud-Basso

EBRD President Odile Renaud-Basso: Bulgaria is making good progress toward joining the Eurozone

Bulgaria is making good progress toward joining the Eurozone, as inflation is decreasing towards the threshold set by the criteria, European Bank for Reconstruction and Development President Odile Renaud-Basso said in an interview with BTA. The..

published on 3/20/25 9:10 AM

Bulgarian Ministry of Transport confirms priority of Corridor No. 8 connecting the Adriatic with the Black Sea

Bulgaria's Ministry of Transport has been working for years to develop Corridor No. 8, connecting the Adriatic with the Black Sea through Albania, North Macedonia and Bulgaria. Of the 1,220 km of railway line along the corridor, 747 km are on the..

published on 3/15/25 10:57 AM