550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
GERB-SDS have sent an invitation for an "expert conversation" on forming a government to "Democratic Bulgaria", ITN and BSP. There will be no invitation to "We Continue the Change", GERB leader Boyko Borisov said. He asked President..
Today we are witnessing another stage in the deepening of our cooperation with the United States Trade and Development Agency (USTDA). This was what caretaker Prime Minister Dimitar Glavchev said at a ceremony in the Council of..
At a press conference in Sofia, Caretaker Minister of Interior Atanas Ilkov commented on Bulgaria's accession to Schengen. ''We have managed to bring down the migrant pressure to 70% at the border. In the interior of the country, the number of..
By December 31, the road from the Greek side to the Rudozem - Xanthi border checkpoint will be ready, said Christodoulos Topsidis, Eastern Macedonia and..
The Council of the European Union decided that checks at the land Schengen borders of Bulgaria and Romania will be lifted from January 1, the..
'Russia has allocated EUR 69 million for the spread of propaganda and significant interference in the internal affairs of Bulgaria and Romania',..
+359 2 9336 661