550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
On Thursday, minimum temperatures in Bulgaria will be between minus 1 and 4°C. In Sofia, it is expected to be 0°C. There will be fog over the lowlands of southern Bulgaria in the morning hours, clearing later in the day as the north-westerly winds pick..
By December 31, the road from the Greek side to the Rudozem - Xanthi border checkpoint will be ready, said Christodoulos Topsidis, Eastern Macedonia and Thrace Regional Governor during his visit in Smolyan, reported BTA . Christodoulos Topsidis..
At the consultations with President Rumen Radev on the formation of a government within the 51st P arliament, the co-chairman of the fifth largest parliamentary group ( BSP - United Left ) Atanas Zafirov was adamant that a regular government..
It is too early to predict how the events in Syria would affect the war in Ukraine. This is what EU Defense Commissioner Andrius..
Hundreds of miners protested outside the Council of Ministers while an extraordinary meeting of the National Council for Tripartite Cooperation was..
"I am addressing a question to the Prime Minister regarding information that on November 26 this year, a group of Bulgarian citizens was on trial in..
+359 2 9336 661