Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Outage of Kozloduy NPP’s reactor 6 for preventive maintenance

Photo: Kozloduy NPP

An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.

The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.

The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Yellow code for dangerous precipitation in 11 regions of the country and Sofia

On Thursday , a cold atmospheric front will pass through the country. It will be rainy with thunders over the whole of Bulgaria. There are conditions for hail. The lowest temperatures will be between 7 and 12°; in Sofia – about 7°C...

published on 4/24/24 6:45 PM
Vladimir Malinov and Olesya Ilashchuk

Bulgaria will take part in rebuilding Ukraine’s energy infrastructure

Bulgaria will assist Ukraine in the process of rebuilding its energy infrastructure. This was announced after a meeting between Bulgaria’s Energy Minister Vladimir Malinov and Ukraine’s ambassador to Bulgaria Olesya Ilashchuk. “Deepening..

published on 4/24/24 5:57 PM
Temenuzhka Petkova

Parliament facilitating employment of third-country nationals for seasonal work

The Parliamentary Committee on Tourism has adopted at first reading the Bill for Amendments to the Foreigners in the Republic of Bulgaria Act, submitted by Manoil Manev and Temenuzhka Petkova from the GERB-SDS parliamentary group, which..

published on 4/24/24 3:58 PM