There are two dates set down in the recovery and resilience plan, adopted by the government, for the closure of the coal-fired power stations – 2038 or in 2040, caretaker Prime Minister Stefan Yanev announced.
“The mechanism of fixing these dates is yet to be finalized on the basis of technical analysis. If the date can be after 2040 – then so be it. But let’s not juggle dates around and scare people. Quite the opposite, what we want is predictability,” PM Yanev said.
“A great deal of work has gone into the document over the past 5 months. The plan was discussed with the 46th National Assembly and with the affected organizations from the industry,” Stefan Yanev added.
The plan is to be submitted to the European Commission for discussion and negotiation on 15 October.
On this day, 90 years ago, the dedication of the Freedom Monument on Mount Shipka took place. It was erected in memory of the fallen heroes of the defended place during the Battle of Shipka, around which the decisive battles for the Russo-Turkish War..
Sunny weather will prevail on Monday. In the afternoon and until midnight, cumulus and cumulus-rain clouds will develop and in some places there will be short-term precipitation accompanied by thunder. They will be more significant in the extreme..
An important meeting of the Bulgarian ambassador in Abuja promoted cultural exchange between Bulgaria and Nigeria , CBAAC News Journal reports. It is about the participation of His Excellency Yanko Yordanov in a cultural discussion with the Director..
The European Prosecutor's Office in Sofia has seized property as part of an investigation into a project worth 2.6 million euros (5.2 million leva),..
The queue of trucks in the area of the Danube Bridge border crossing near Ruse is two kilometers long . The remaining heavy load trucks wait mainly in..
The Prime Minister of the Republic of North Macedonia Hristijan Mickoski stated that there will be personnel changes in the Joint Multidisciplinary..
+359 2 9336 661