Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

European Commission to assess Bulgaria’s Recovery and Resilience Plan within two months

Photo: BGNES

The quality of the Recovery and Resilience Plan is more important than the speed of payments, said Tsvetan Kyulanov, Head of the European Commission's Representation in Bulgaria.

In his words, the European Commission usually assesses the Member States’ recovery and resilience plans within two months after submission. Following the Commission, the Council approves the document within a period of one month, Tsvetan Kyulanov explained. Bulgaria can receive the first grant under the Recovery and Resilience Plan to the tune of 13% of the expected EUR 6 billion at the beginning of 2022 at the earliest, Tsvetan Kyulanov added.

The head of the European Commission’s Representation in Bulgaria refused to comment on the substance of the document because the European Commission has not yet become acquainted with it.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM