The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
The International Exhibition of Viticulture and Winemaking "Vinaria" 2025 will once again present the latest trends in wine-making at International Fair Plovdiv. Within the framework of the 32nd edition, from February 18 to 22,..
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra 2025" exhibition in the halls of the International Fair in Plovdiv, BTA reports. This year's..
On Tuesday, the lowest temperatures will be between minus 5 and 0°C; in Sofia - around minus 5°C. It will remain cold and cloudy with snowfalls over most of the country and rainfall in the southeastern regions. The snow cover will..
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra..
The Vazrazhdane parliamentary party is organizing a protest on February 22 in front of the Bulgarian National Bank against Bulgaria's entry into the..
The agriculture sector in Bulgaria maintains its stability, providing employment to 6% of the population and forming about 4% of the country's GDP. This..
+359 2 9336 661