Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Caretaker cabinet vows to EC to put through judicial reforms

Minister of Justice Ivan Demerdzhiev
Photo: BNR

“The European Commission has raised the issue, with particular poignancy, of the liability of the prosecutor general and of public scrutiny of his acts,” caretaker Minister of Justice Ivan Demerdzhiev said for BNT.

The caretaker government has set down measures on the matter in the Recovery and Resilience Plan. Their implementation is connected with the funding set down in the plan. The measures shall provide for the possibility of investigating the prosecutor general, and temporarily removing him from office for the duration of the investigation. No amendments to the constitution are necessary for these measures to be put in place, Minister Demerdzhiev added. He commented that the specialized judicial institutions must exist, though not in the way they are now functioning. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Kristian Vigenin

If BSP receives the third mandate, it will try to form expert cabinet

The return of the second mandate was not unexpected, deputy chairman of the BSP Kristian Vigenin said. According to him, forming a government within the framework of the 50th parliament is increasingly difficult to achieve. However,..

published on 7/22/24 2:28 PM

PP-DB returns the second mandate immediately after it was handed over

President Rumen Radev handed over the second exploratory mandate to form a government to the second largest parliamentary group in the 50th National Assembly - "We Continue the Change" - "Democratic Bulgaria" coalition (PP-DB).  At the handing..

published on 7/22/24 12:14 PM

Caretaker government signs contract for East-West energy corridor feasibility study

A contract between the US Trade and Development Agency and the Electric Power System Operator for the feasibility study for the East-West Energy Corridor was signed at the Council of Ministers.  The funding, amounting to USD 1.2 million, is..

published on 7/22/24 11:26 AM