Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria starts work on implementation of its Recovery Plan on March 15

Photo: BGNES

The technical approval of the Recovery and Resillience Plan is expected on March 15, after which the assignment of projects can begin, Minister of Finance and Deputy Prime Minister Assen Vassilev said. He confirmed that according to the document, only energy facilities that do not meet environmental standards, such as Brikel and Bobov Dol, would be closed. The Deputy Prime Minister assessed the latest changes in the plan as positive for Bulgaria, especially at the backdrop of the situation in Ukraine.

 "It would have affected us much worse if we had accepted the closure of facilities in the Maritsa basin and the construction of a steam and gas plant." The plan includes the construction of facilities for storing electricity through batteries, Assen Vassilev said. According to him, the maintenance of such a facility was a matter of national security, especially in cases of disruption of global supplies and communication routes.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM