“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
Saturday will be cloudy with cumulus and cumulonimbus clouds, especially in the afternoon. Rain will fall in many places, with thunderstorms in some areas. Winds will be moderate west-northwest. Maximum temperatures will be between 14° and 19°C, around..
It is 21 years today since the tragedy in the River Lim on the border between Serbia and Montenegro, in which 12 Bulgarian children were killed. On 4 April, 2004, a group of 34 students and 16 adults from Svishtov were returning home from a school..
Bulgaria, Azerbaijan, Turkey and Georgia have signed a Memorandum of Understanding in Baku on cooperation in the transmission and trade of green energy. The document was inked by the energy ministers of Bulgaria and Azerbaijan, Zhecho Stankov and..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The..
The Ministry of the Interior has submitted 13,000 reports about poor road conditions in 2024 . This was revealed in an interview with Nova TV by Chief..
+359 2 9336 661