The Greece-Bulgaria gas interconnector has successfully been connected to Bulgaria’s national and transit gas transmission network.
According to the project company, connecting the infrastructure of the two independent transmission operators for Bulgaria - ICGB and Bulragtransgaz – was carried out between 16 and 17 August near Stara Zagora.
The interconnector is already successfully connected to the operators in the two neighbouring countries, and this means that the physical transmission of gas along the pipeline is technically provided for. After the mandatory non-destructive testing of the interconnector with the Bulgartransgaz network, the section will be buried. With this, all mechanical work will have been completed.
The standard of living in Sofia and some larger cities in Bulgaria is high. However, more attention should be paid to the regions of the country that are significantly lagging behind in terms of income, economist Georgi Vuldzhev has..
The formation of the next aid package for Ukraine is at the final stage and it can be submitted to the Council of Ministers today, said caretaker Minister of Defense Atanas Zapryanov, who participated in a conference on the occasion..
The return of the second mandate was not unexpected, deputy chairman of the BSP Kristian Vigenin said. According to him, forming a government within the framework of the 50th parliament is increasingly difficult to achieve...
A total of 60 officers from the Bezmer and Kabile units are on the ground with equipment for firefighting, Bulgaria's Defence Minister Atanas Zapryanov..
A man and a child have died after they were struck by lightning in the area of Mount Zhultets near Mount Botev in the Central Balkan Mountains. The alert..
The fire on the territory of the villages of Voden, Krainovo and Strandzha in the municipality of Bolyarovo has been controlled and localised. Interior..
+359 2 9336 661